IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0317 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,568 $120 Implemented
MI0317 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,683 $1,885 Implemented
MI0317 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,154 $2,140 Not Implemented
MI0317 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $431 $151 Not Implemented
OK0976 # 01 Y:2017 01 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $31,812 $180,000 Implemented
OK0976 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $8,586 $3,840 Implemented
OK0976 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,176 $61,707 Implemented
OK0976 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,185 $3,480 Not Implemented
OK0976 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,681 $35,200 Not Implemented
OK0976 # 06 Y:2017 06 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,094 $22,000 Not Implemented
OK0976 # 07 Y:2017 07 2017 INSTALL SET-BACK TIMERS $1,177 $240 Implemented
OK0976 # 08 Y:2017 08 2017 KEEP EQUIPMENT CLEAN $885 $240 Implemented
LE0441 # 01 Y:2017 01 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,712 $20 Not Implemented
LE0441 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,114 $20 Implemented
LE0441 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,738 $1,000 Implemented
LE0441 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $57,323 $15,000 Not Implemented
LE0441 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $831 $1,000 Not Implemented
LE0441 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,845 $16,000 Not Implemented
LE0441 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $780 $2,067 Implemented
LE0441 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,133 $9,520 Implemented
MZ0233 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,640 $350 Not Implemented
MZ0233 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,041 $34,350 Not Implemented
MZ0233 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $762 $1,222 Not Implemented
MZ0233 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $605 $0 Not Implemented
UF0509 # 01 Y:2017 01 2017 INSTALL COMMON HEADER ON COMPRESSORS $5,078 $10,260 Not Implemented