Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,598
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0667 # 04 Y:2025 | 04 | 2025 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,121 | $299 | n/a |
SD0667 # 06 Y:2025 | 06 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $17,049 | $46,406 | n/a |
SD0667 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $260,930 | $10,784 | n/a |
SD0667 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $418,912 | $524,659 | n/a |
SD0667 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,877 | $3,727 | n/a |
SD0667 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,190 | $8,318 | n/a |
SD0667 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,797 | $0 | n/a |
SJ0030 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,627 | $195,217 | n/a |
SJ0030 # 06 Y:2025 | 06 | 2025 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $70,368 | $30,719 | n/a |
SJ0030 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $630,866 | $6,247,450 | n/a |
SJ0030 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,245 | $0 | n/a |
SJ0030 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,287 | $0 | n/a |
SJ0030 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $136 | $1,200 | n/a |
SJ0030 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,538 | $18,930 | n/a |
SJ0030 # 08 Y:2025 | 08 | 2025 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $663 | $4,755 | n/a |
SF0624 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,414 | $1,073 | n/a |
SF0624 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $130,070 | $760,719 | n/a |
SF0624 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,603 | $0 | n/a |
SF0624 # 03 Y:2024 | 03 | 2024 | USE PHOTOCELL CONTROLS | $509 | $718 | n/a |
SF0624 # 04 Y:2024 | 04 | 2024 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,370 | $58,959 | n/a |
SD0659 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,955 | $2,109 | n/a |
SD0659 # 04 Y:2024 | 04 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $78,160 | $16,180 | n/a |
SD0659 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $86,343 | $34,702 | n/a |
SD0659 # 12 Y:2024 | 12 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $56,412 | $3,345 | n/a |
SD0659 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,742 | $3,181 | n/a |