Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0295 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $423 | $0 | Implemented |
BD0295 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,724 | $0 | Implemented |
BD0295 # 05 Y:2005 | 05 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,487 | $3,000 | Implemented |
BD0295 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $14,253 | $2,875 | Implemented |
BD0295 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,391 | $900 | Implemented |
BD0295 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,254 | $8,470 | Implemented |
BD0295 # 01 Y:2005 | 01 | 2005 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $32,765 | $600 | Implemented |
BD0291 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,984 | $17,000 | Not Implemented |
BD0291 # 14 Y:2005 | 14 | 2005 | $2,950 | $0 | Not Implemented | |
BD0291 # 13 Y:2005 | 13 | 2005 | $3,744 | $2,500 | Not Implemented | |
BD0291 # 12 Y:2005 | 12 | 2005 | INSTALL OCCUPANCY SENSORS | $1,620 | $2,000 | Not Implemented |
BD0291 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,162 | $2,000 | Not Implemented |
BD0291 # 10 Y:2005 | 10 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $2,257 | $2,500 | Not Implemented |
BD0291 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,677 | $0 | Not Implemented |
BD0291 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,134 | $2,200 | Not Implemented |
BD0291 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,582 | $11,250 | Not Implemented |
BD0291 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $6,678 | $1,000 | Not Implemented |
BD0291 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,030 | $2,850 | Not Implemented |
BD0291 # 04 Y:2005 | 04 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $11,415 | $13,500 | Not Implemented |
BD0291 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,444 | $2,886 | Not Implemented |
BD0291 # 01 Y:2005 | 01 | 2005 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $126,274 | $320,000 | Not Implemented |
IC0099 # 01 Y:2005 | 01 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,719 | $35,000 | Not Implemented |
IC0099 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,085 | $66,591 | Not Implemented |
IC0099 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $246 | $0 | Implemented |
IC0099 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,577 | $1,200 | Implemented |