Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
754
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2415 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $72,820 | $0 | n/a |
UL2415 # 03 Y:2024 | 03 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $62,771 | $58,367 | n/a |
UL2415 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,401 | $2,438 | n/a |
UL2415 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,257 | $2,700 | n/a |
UL2415 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,863 | $758,879 | n/a |
UL2415 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $28,874 | $11,700 | n/a |
IP0197 # 01 Y:2024 | 01 | 2024 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $33,478 | $697 | n/a |
IP0197 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,000 | $1,506 | n/a |
IP0197 # 02 Y:2024 | 02 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,662 | $320 | n/a |
IP0197 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,370 | $13,000 | n/a |
IP0197 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,867 | $18,107 | n/a |
IP0196 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,327 | $2,497 | n/a |
IP0196 # 02 Y:2024 | 02 | 2024 | MODIFY STARTUP/SHUTDOWN TIMES | $1,880 | $40 | n/a |
IP0196 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $563 | $520 | n/a |
IP0196 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,499 | $2,975 | n/a |
IP0196 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,126 | $42 | n/a |
IP0196 # 01 Y:2024 | 01 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $507 | $0 | n/a |
IP0189 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $1,248 | $716 | Implemented |
IP0189 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,822 | $0 | Implemented |
IP0189 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $43,723 | $84,496 | Implemented |
IP0189 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,450 | $33 | Implemented |
IP0189 # 03 Y:2024 | 03 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,852 | $325 | Implemented |
IC0298 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,618 | $558 | n/a |
IC0298 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $216,800 | $1,202,971 | n/a |
IC0298 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $3,568 | $280 | n/a |