IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

209

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2318 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,695 $2,160 n/a
UL2318 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $59,688 $501,748 n/a
UL2318 # 04 Y:2023 04 2023 INSTALL SPECTRAL REFLECTORS / DELAMP $1,046 $0 n/a
UL2318 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $1,925 $6,408 n/a
UL2318 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,544 $12,786 n/a
UL2318 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,952 $10,400 n/a
UL2318 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,113 $0 n/a
UL2317 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $2,077 n/a
UL2317 # 04 Y:2023 04 2023 INSTALL SPECTRAL REFLECTORS / DELAMP $2,720 $500 n/a
UL2317 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,159 $0 n/a
UL2317 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $16,039 $148,666 n/a
UL2317 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $6,865 $9,100 n/a
UL2211 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,815 $0 Implemented
UL2211 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,600 $15,000 Not Implemented
UL2211 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,806 $20,000 Not Implemented
UL2211 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $61,887 $45,461 Implemented
UL2211 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $96,458 $783,531 Not Implemented
UL2211 # 06 Y:2022 06 2022 USE SOLAR HEAT TO HEAT WATER $60,938 $150,000 Not Implemented
UL2211 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,765 $0 Implemented
UK1912 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,080 $363 Not Implemented
UK1912 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,744 $8,695 Not Implemented
UK1912 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,487 $2,150 Implemented
UK1912 # 07 Y:2019 07 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $16,009 $41,650 Not Implemented
UK1912 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,364 $30,555 Implemented
UK1912 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $90,133 $6,406 Not Implemented