Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0084 # 05 Y:1996 | 05 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,744 | $600 | Not Implemented |
NC0084 # 13 Y:1996 | 13 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $20,000 | $2,000 | Not Implemented |
NC0084 # 12 Y:1996 | 12 | 1996 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $25,015 | $18,000 | Implemented |
NC0084 # 11 Y:1996 | 11 | 1996 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,960 | $2,000 | Implemented |
NC0084 # 10 Y:1996 | 10 | 1996 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,582 | $4,720 | Not Implemented |
NC0084 # 09 Y:1996 | 09 | 1996 | INSULATE BARE EQUIPMENT | $932 | $549 | Implemented |
NC0084 # 08 Y:1996 | 08 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,827 | $2,970 | Implemented |
NC0084 # 07 Y:1996 | 07 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,284 | $640 | Not Implemented |
NC0084 # 06 Y:1996 | 06 | 1996 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,221 | $5,100 | Not Implemented |
NC0084 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,498 | $1,700 | Implemented |
NC0084 # 03 Y:1996 | 03 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,833 | $400 | Implemented |
NC0084 # 02 Y:1996 | 02 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,441 | $3,000 | Implemented |
NC0084 # 01 Y:1996 | 01 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,895 | $10,000 | Implemented |
NC0076 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $585 | $210 | Implemented |
NC0076 # 05 Y:1996 | 05 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,566 | $680 | Not Implemented |
NC0076 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,499 | $178,900 | Not Implemented |
NC0076 # 03 Y:1996 | 03 | 1996 | USE POWER DURING OFF-PEAK PERIODS | $5,153 | $0 | Implemented |
NC0076 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,856 | $7,415 | Not Implemented |