IAC logo
IAC Assessment: NC0076
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0076
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Custom Injected Molded Plastics
NAICS n/a
SIC 3070 -
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 28,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 7,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,178 3,043,083 kWh $0.03
Electricity Demand $54,725 6,390 kW-months/year $8.56
TOTAL ENERGY COSTS $156,469
RECOMMENDED SAVINGS* $56,659 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,738
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$585
Cost:
$210
$411 12,016 $174 21 - - $411
12,016
kWh
$174
21
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,856
Cost:
$7,415
$2,675 82,649 $1,181 141 - - $2,675
82,649
kWh
$1,181
141
kW-months/year
-
-
lb
03: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$5,153
Cost:
-
$5,153 153,283 - - - - $5,153
153,283
kWh
-
-
kW-months/year
-
-
lb
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$44,499
Cost:
$178,900
$31,383 916,764 $13,116 1,580 - - $31,383
916,764
kWh
$13,116
1,580
kW-months/year
-
-
lb
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,566
Cost:
$680
- - - - $2,566 171,000 -
-
kWh
-
-
kW-months/year
$2,566
171,000
lb
TOTAL RECOMMENDED Savings:
$56,659
Cost:
$187,205
$39,622 1,164,712 $14,471 1,742 $2,566 171,000 $39,622
1,164,712
kWh
$14,471
1,742
kW-months/year
$2,566
171,000
lb
TOTAL IMPLEMENTED Savings:
$5,738
Cost:
$210
$5,564 165,299 $174 21 - - $5,564
165,299
kWh
$174
21
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)