Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,756
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1072 # 07 Y:2024 | 07 | 2024 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $14,674 | $67,830 | n/a |
UD1072 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,199 | $864 | n/a |
UD1072 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,892 | $12,650 | n/a |
UD1072 # 03 Y:2024 | 03 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $63 | $216 | n/a |
UD1072 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,343 | $1,667 | n/a |
UD1072 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,454 | $952 | n/a |
UD1072 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,741 | $0 | n/a |
UD1071 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,651 | $2,800 | n/a |
UD1071 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,375 | $15,030 | n/a |
UD1071 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,777 | $1,275 | n/a |
UD1071 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,691 | $0 | n/a |
UD1071 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,111 | $952 | n/a |
UD1071 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $60,417 | $127,158 | n/a |
UD1069 # 07 Y:2023 | 07 | 2023 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $51,914 | $75,982 | n/a |
UD1069 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,796 | $5,078 | n/a |
UD1069 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $1,799 | $0 | n/a |
UD1069 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,894 | $1,403 | n/a |
UD1069 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,461 | $952 | n/a |
UD1069 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $1,372 | $1,389 | n/a |
UD1069 # 08 Y:2023 | 08 | 2023 | COVER OPEN TANKS | $42 | $70 | n/a |
UD1069 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $31,978 | $0 | n/a |
CW0129 # 02 Y:2023 | 02 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $21,901 | $86,580 | n/a |
CW0129 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $10,973 | $2,300 | n/a |
CW0129 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,343 | $37,000 | n/a |
CW0129 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $951 | $180 | n/a |