IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2403 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,147 $4,257 n/a
UW2403 # 03 Y:2024 03 2024 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $222,893 $500,000 n/a
UW2403 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,988 $1,080 n/a
UW2403 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,319 $720 n/a
UW2403 # 06 Y:2024 06 2024 UPGRADE OBSOLETE EQUIPMENT $6,846 $30,000 n/a
UW2403 # 07 Y:2024 07 2024 USE RADIANT HEATER FOR SPOT HEATING $8,794 $58,500 n/a
UW2403 # 08 Y:2024 08 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,078 $36,400 n/a
UW2403 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $8,480 $4,010 n/a
OR0732 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,586 $0 Not Implemented
OR0732 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,378 $0 Implemented
OR0732 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,849 $0 Not Implemented
OR0732 # 01 Y:2020 01 2020 INSULATE BARE EQUIPMENT $26,977 $0 Not Implemented
OR0732 # 05 Y:2020 05 2020 USE SYNTHETIC LUBRICANT $9,084 $0 Not Implemented
OR0732 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,898 $0 Not Implemented
OR0719 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $7,063 $6,896 Implemented
OR0719 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $8,576 $12,018 Implemented
OR0719 # 03 Y:2019 03 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,031 $9,861 Implemented
OR0702 # 02 Y:2018 02 2018 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,088 $660 Not Implemented
OR0702 # 01 Y:2018 01 2018 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $20,800 $7,140 Not Implemented
OR0702 # 03 Y:2018 03 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,409 $1,005 Not Implemented
OR0702 # 04 Y:2018 04 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,065 $5,807 Not Implemented
OR0673 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,464 $0 Implemented
OR0673 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $4,333 $229 Not Implemented
OR0673 # 01 Y:2016 01 2016 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $157,793 $301,613 Not Implemented
OR0673 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $102,571 $10,390 Not Implemented