Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
245
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0667 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $2,850 | $10,551 | n/a |
WV0667 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $2,181 | $2,720 | n/a |
WV0667 # 14 Y:2024 | 14 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $328 | $1,530 | n/a |
WV0667 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $874 | $1,127 | n/a |
WV0667 # 10 Y:2024 | 10 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,648 | $8,028 | n/a |
WV0667 # 02 Y:2024 | 02 | 2024 | INSTALL TURBULATORS | $6,784 | $4,404 | n/a |
WV0667 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,123 | $7,270 | n/a |
WV0667 # 01 Y:2024 | 01 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,417 | $2,917 | n/a |
WV0667 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,396 | $18,935 | n/a |
WV0667 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,599 | $13,481 | n/a |
WV0667 # 11 Y:2024 | 11 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $1,520 | $7,198 | n/a |
WV0667 # 05 Y:2024 | 05 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $4,235 | $20,025 | n/a |
WV0667 # 13 Y:2024 | 13 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $678 | $1,484 | n/a |
WV0667 # 08 Y:2024 | 08 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,409 | $5,810 | n/a |
WV0652 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,902 | $2,750 | Implemented |
WV0652 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,967 | $2,160 | Implemented |
WV0652 # 06 Y:2023 | 06 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $8,659 | $22,700 | Not Implemented |
WV0652 # 04 Y:2023 | 04 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,975 | $1,500 | Implemented |
WV0652 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,958 | $210,200 | Not Implemented |
WV0652 # 05 Y:2023 | 05 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $13,792 | $1,942 | Implemented |
WV0652 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $193,156 | $160,000 | Not Implemented |
WV0652 # 10 Y:2023 | 10 | 2023 | INSULATE BARE EQUIPMENT | $506 | $166 | Implemented |
WV0652 # 03 Y:2023 | 03 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $22,798 | $1,500 | Implemented |
WV0652 # 09 Y:2023 | 09 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,118 | $7,210 | Implemented |
WV0636 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $1,927 | $2,021 | Implemented |