IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

510

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0144 # 04 Y:2002 04 2002 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $968 $0 Not Implemented
LE0144 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,579 $1,000 Not Implemented
LE0144 # 03 Y:2002 03 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,820 $9,600 Not Implemented
LE0144 # 05 Y:2002 05 2002 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $636 $0 Not Implemented
LE0144 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,456 $0 Not Implemented
AS0336 # 05 Y:2002 05 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,343 $14,000 Not Implemented
AS0336 # 06 Y:2002 06 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $9,360 $40 Implemented
AS0336 # 04 Y:2002 04 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $418 $30 Implemented
AS0336 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $0 Not Implemented
AS0336 # 09 Y:2002 09 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,820 $2,080 Implemented
AS0336 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $72,604 $3,840 Implemented
AS0336 # 07 Y:2002 07 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $62,280 $2,200 Not Implemented
AS0336 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $463 $1,250 Not Implemented
AS0336 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,845 $273 Not Implemented
SF0249 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $595 $366 Not Implemented
SF0249 # 07 Y:2002 07 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,090 $7,975 Not Implemented
SF0249 # 11 Y:2002 11 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,555 $166,322 Not Implemented
SF0249 # 03 Y:2002 03 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,151 $1,893 Not Implemented
SF0249 # 02 Y:2002 02 2002 UPGRADE CONTROLS ON COMPRESSORS $9,751 $0 Implemented
SF0249 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $5,440 $3,960 Not Implemented
SF0249 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,508 $0 Implemented
SF0249 # 10 Y:2002 10 2002 INSULATE BARE EQUIPMENT $3,436 $9,800 Implemented
SF0249 # 08 Y:2002 08 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $365 $750 Not Implemented
SF0249 # 09 Y:2002 09 2002 REDUCE FLUID FLOW RATES $3,021 $7,646 Not Implemented
SF0249 # 06 Y:2002 06 2002 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $50,830 $54,425 Not Implemented