Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
219
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0198 # 04 Y:2021 | 04 | 2021 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $16,090 | $1,500 | Not Implemented |
DL0198 # 08 Y:2021 | 08 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,320 | $7,000 | Not Implemented |
DL0198 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,740 | $14,428 | Implemented |
DL0198 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,850 | $0 | Implemented |
DL0198 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,800 | $0 | Implemented |
DL0198 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $29,500 | $0 | Not Implemented |
DL0198 # 06 Y:2021 | 06 | 2021 | INSULATE BARE EQUIPMENT | $2,034 | $5,600 | Not Implemented |
DL0198 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,240 | $2,500 | Implemented |
DL0198 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,100 | $6,477 | Not Implemented |
WV0615 # 06 Y:2021 | 06 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $2,598 | $5,175 | Implemented |
WV0615 # 10 Y:2021 | 10 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $307 | $1,000 | Implemented |
WV0615 # 01 Y:2021 | 01 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $8,661 | $16,998 | Not Implemented |
WV0615 # 04 Y:2021 | 04 | 2021 | INSULATE BARE EQUIPMENT | $3,209 | $13,902 | Not Implemented |
WV0615 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,040 | $233 | Implemented |
WV0615 # 08 Y:2021 | 08 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $913 | $688 | Implemented |
WV0615 # 05 Y:2021 | 05 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,781 | $2,300 | Implemented |
WV0615 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $4,561 | $13,105 | Not Implemented |
WV0615 # 09 Y:2021 | 09 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $755 | $3,140 | Not Implemented |
WV0615 # 07 Y:2021 | 07 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $944 | $70 | Implemented |
MI0396 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,263 | $1,487 | Not Implemented |
MI0396 # 02 Y:2021 | 02 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $27,588 | $100 | Not Implemented |
MI0396 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,464 | $3,060 | Not Implemented |
MI0396 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,908 | $2,020 | Implemented |
MI0396 # 06 Y:2021 | 06 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,320 | $1,290 | Not Implemented |
MI0396 # 01 Y:2021 | 01 | 2021 | PAY UTILITY BILLS ON TIME | $27,408 | $0 | Implemented |