IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

601

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0132 # 11 Y:1994 11 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $636 $1,195 Implemented
HO0090 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,802 $2,384 Not Implemented
HO0090 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,740 $3,662 Not Implemented
HO0090 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,947 $2,647 Not Implemented
HO0090 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,165 $1,000 Not Implemented
HO0090 # 05 Y:1994 05 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,796 $2,000 Not Implemented
HO0090 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $936 $400 Not Implemented
UM0012 # 07 Y:1994 07 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,836 $0 Implemented
UM0012 # 06 Y:1994 06 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $615 $500 Not Implemented
UM0012 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,888 $2,000 Not Implemented
UM0012 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,273 $1,600 Implemented
UM0012 # 03 Y:1994 03 1994 USE RADIANT HEATER FOR SPOT HEATING $2,542 $6,800 Not Implemented
UM0012 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,236 $4,084 Implemented
UM0012 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,061 $2,890 Implemented
AM0220 # 06 Y:1994 06 1994 WASH AND REUSE RAGS ON-SITE $2,070 $7,900 Implemented
AM0220 # 07 Y:1994 07 1994 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $670 $2,400 Implemented
AM0220 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,620 $3,800 Implemented
AM0220 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $37,861 $92,046 Implemented
AM0220 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $44,845 $120,000 Implemented
AM0220 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $96,105 $145,000 Implemented
AM0220 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $12,915 $6,250 Implemented
KU0443 # 11 Y:1994 11 1994 COMBINE UTILITY METERS $156 $10 Implemented
KU0443 # 10 Y:1994 10 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $759 $180 Implemented
KU0443 # 09 Y:1994 09 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,645 $150 Implemented
KU0443 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,178 $174 Implemented