Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
644
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DS0075 # 06 Y:1996 | 06 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,520 | $0 | Implemented |
DS0075 # 05 Y:1996 | 05 | 1996 | INSTALL SET-BACK TIMERS | $2,926 | $150 | Implemented |
DS0075 # 04 Y:1996 | 04 | 1996 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $21,114 | $0 | Not Implemented |
DS0075 # 03 Y:1996 | 03 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,576 | $8,500 | Implemented |
DS0075 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,487 | $21,753 | Implemented |
DS0075 # 01 Y:1996 | 01 | 1996 | OPTIMIZE PLANT POWER FACTOR | $2,348 | $1,700 | Implemented |
AR0097 # 04 Y:1996 | 04 | 1996 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $25,240 | $20,000 | Not Implemented |
AR0097 # 08 Y:1996 | 08 | 1996 | MINIMIZE WATER USAGE | $1,489 | $1,000 | Implemented |
AR0097 # 07 Y:1996 | 07 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,027 | $4,900 | Implemented |
AR0097 # 03 Y:1996 | 03 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,972 | $1,745 | Not Implemented |
AR0097 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,496 | $11,870 | Implemented |
AR0097 # 05 Y:1996 | 05 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $929 | $0 | Implemented |
AR0097 # 06 Y:1996 | 06 | 1996 | OPTIMIZE PLANT POWER FACTOR | $5,388 | $1,000 | Implemented |
AR0097 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,485 | $120 | Implemented |
CO0378 # 07 Y:1996 | 07 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $330 | $150 | Implemented |
CO0378 # 04 Y:1996 | 04 | 1996 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,770 | $3,010 | Not Implemented |
CO0378 # 09 Y:1996 | 09 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $200 | $160 | Not Implemented |
CO0378 # 02 Y:1996 | 02 | 1996 | $4,590 | $630 | Implemented | |
CO0378 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,430 | $15,373 | Implemented |
CO0378 # 03 Y:1996 | 03 | 1996 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $1,940 | $1,790 | Not Implemented |
CO0378 # 08 Y:1996 | 08 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44 | $58 | Implemented |
CO0378 # 06 Y:1996 | 06 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $360 | $160 | Implemented |
SF0105 # 01 Y:1996 | 01 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $856 | $3,000 | Implemented |
SF0105 # 02 Y:1996 | 02 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $905 | $1,082 | Implemented |
CO0378 # 05 Y:1996 | 05 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $500 | $0 | Implemented |