IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

310

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0130 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,865 $1,074 Implemented
MI0130 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,043 $720 Not Implemented
MI0130 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,895 $3,800 Implemented
MI0130 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,650 $30 Not Implemented
UF0377 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,493 $334 Not Implemented
UF0377 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $493 $415 Not Implemented
UF0377 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,064 $0 Not Implemented
UF0377 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $341 $0 Not Implemented
UF0377 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $542 $750 Not Implemented
UF0377 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,507 $13,121 Not Implemented
UF0377 # 07 Y:2006 07 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,877 $21,000 Not Implemented
UF0377 # 08 Y:2006 08 2006 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $626,232 $1,134,871 Not Implemented
UF0377 # 09 Y:2006 09 2006 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $4,718 $463 Not Implemented
UF0377 # 10 Y:2006 10 2006 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,000 $0 Not Implemented
UD0740 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,164 $258,960 Not Implemented
UD0740 # 02 Y:2006 02 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $107,569 $256,000 Implemented
UD0740 # 03 Y:2006 03 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $56,879 $252,100 Implemented
UD0740 # 04 Y:2006 04 2006 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $45,101 $17,030 Not Implemented
UD0740 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $42,737 $0 Implemented
UD0740 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,847 $52,400 Not Implemented
UD0740 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,352 $2,280 Implemented
UD0740 # 08 Y:2006 08 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,428 $10,000 Not Implemented
UD0740 # 09 Y:2006 09 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,096 $0 Implemented
UD0740 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,805 $1,500 Implemented
UD0740 # 11 Y:2006 11 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,326 $1,700 Implemented