IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

242

matching recommendations
Reset
SIC 301 Tires And Inner Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0515 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,441 $1,500 Implemented
LE0515 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,213 $0 Implemented
LE0515 # 07 Y:2021 07 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $622 $3,000 Not Implemented
LE0515 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $150,000 $700,000 Implemented
LE0515 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,658 $6,990 Implemented
LE0515 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,306 $1,500 Implemented
LE0515 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,979 $10,500 Not Implemented
TT0214 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $13,401 $5,000 Implemented
TT0214 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,974 $152,490 Not Implemented
TT0214 # 01 Y:2019 01 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $223,429 $3,000 Implemented
TT0214 # 03 Y:2019 03 2019 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $24,664 $106,000 Not Implemented
TT0214 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,330 $66,000 Not Implemented
TT0214 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,443 $15,674 Not Implemented
TT0214 # 05 Y:2019 05 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $23,715 $75,000 Not Implemented
OK0940 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,231 $2,782 Implemented
OK0940 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,700 $1,000 Implemented
OK0940 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,586 $7,700 Not Implemented
OK0940 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,268 $4,752 Not Implemented
OK0940 # 01 Y:2016 01 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,811 $17,000 Not Implemented
OK0940 # 06 Y:2016 06 2016 INSTALL SET-BACK TIMERS $1,433 $1,280 Implemented
OK0940 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,509 $14,500 Not Implemented
OK0940 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,330 $17,442 Not Implemented
OK0940 # 08 Y:2016 08 2016 OPTIMIZE PLANT POWER FACTOR $5,900 $38,500 Not Implemented
MZ0189 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,361 $0 Not Implemented
MZ0189 # 06 Y:2015 06 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,139 $0 Implemented