IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
SIC 301 Tires And Inner Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0189 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,361 $0 Not Implemented
MZ0189 # 02 Y:2015 02 2015 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $4,178 $8,000 Not Implemented
MZ0189 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,216 $2,500 Implemented
MZ0189 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,865 $880 Implemented
MZ0189 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,835 $5,500 Not Implemented
MZ0189 # 06 Y:2015 06 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,139 $0 Implemented
WI0096 # 01 Y:1990 01 1990 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $77,488 $400,000 Not Implemented
WI0096 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,714 $0 Not Implemented
WI0096 # 03 Y:1990 03 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,473 $3,895 Implemented
WI0096 # 04 Y:1990 04 1990 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,068 $800 Implemented
WI0096 # 05 Y:1990 05 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $563 $0 Implemented
WI0096 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $560 $500 Implemented
WI0096 # 07 Y:1990 07 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $449 $1,744 Implemented
WI0096 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24 $14 Implemented
WI0096 # 09 Y:1990 09 1990 INSTALL SET-BACK TIMERS $160 $400 Not Implemented
WI0096 # 10 Y:1990 10 1990 INSULATE BARE EQUIPMENT $152 $352 Not Implemented