Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
261
matching recommendationsSIC | 3011 | Tires And Inner Tubes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0325 # 10 Y:2025 | 10 | 2025 | METER WASTE WATER | $1,047 | $1,100 | n/a |
TT0325 # 11 Y:2025 | 11 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $718 | $2,640 | n/a |
TT0325 # 01 Y:2025 | 01 | 2025 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $242,348 | $1,045,217 | n/a |
TT0325 # 02 Y:2025 | 02 | 2025 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $68,822 | $200,000 | n/a |
TT0325 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,049 | $30,040 | n/a |
TT0325 # 04 Y:2025 | 04 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,824 | $22,500 | n/a |
TT0325 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,854 | $400 | n/a |
TT0325 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,974 | $16,000 | n/a |
TT0325 # 03 Y:2025 | 03 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $30,978 | $17,480 | n/a |
TT0325 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $4,068 | $15,000 | n/a |
TT0325 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,955 | $1,000 | n/a |
TT0317 # 16 Y:2024 | 16 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $4,116 | $50,000 | n/a |
TT0317 # 14 Y:2024 | 14 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $698 | $2,910 | n/a |
TT0317 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $2,015 | $1,364 | n/a |
TT0317 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,968 | $2,475 | n/a |
TT0317 # 08 Y:2024 | 08 | 2024 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $64,353 | $60,000 | n/a |
TT0317 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $859 | $400 | n/a |
TT0317 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $6,847 | $8,500 | n/a |
TT0317 # 12 Y:2024 | 12 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,299 | $16,125 | n/a |
TT0317 # 01 Y:2024 | 01 | 2024 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $374,993 | $42,000 | n/a |
TT0317 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,558 | $39,000 | n/a |
TT0317 # 10 Y:2024 | 10 | 2024 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $56,902 | $80,000 | n/a |
TT0317 # 13 Y:2024 | 13 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $205,758 | $600,000 | n/a |
TT0317 # 06 Y:2024 | 06 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $169,411 | $120,000 | n/a |
TT0317 # 02 Y:2024 | 02 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $79,406 | $13,250 | n/a |