Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
234
matching recommendationsSIC | 3011 | Tires And Inner Tubes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0515 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,441 | $1,500 | Implemented |
LE0515 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,306 | $1,500 | Implemented |
LE0515 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,213 | $0 | Implemented |
LE0515 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,658 | $6,990 | Implemented |
LE0515 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,979 | $10,500 | Not Implemented |
LE0515 # 06 Y:2021 | 06 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $150,000 | $700,000 | Implemented |
LE0515 # 07 Y:2021 | 07 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $622 | $3,000 | Not Implemented |
TT0214 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,443 | $15,674 | Not Implemented |
TT0214 # 01 Y:2019 | 01 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $223,429 | $3,000 | Implemented |
TT0214 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $13,401 | $5,000 | Implemented |
TT0214 # 05 Y:2019 | 05 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $23,715 | $75,000 | Not Implemented |
TT0214 # 03 Y:2019 | 03 | 2019 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $24,664 | $106,000 | Not Implemented |
TT0214 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $64,974 | $152,490 | Not Implemented |
TT0214 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,330 | $66,000 | Not Implemented |
OK0940 # 01 Y:2016 | 01 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,811 | $17,000 | Not Implemented |
OK0940 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,700 | $1,000 | Implemented |
OK0940 # 06 Y:2016 | 06 | 2016 | INSTALL SET-BACK TIMERS | $1,433 | $1,280 | Implemented |
OK0940 # 07 Y:2016 | 07 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,268 | $4,752 | Not Implemented |
OK0940 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,231 | $2,782 | Implemented |
OK0940 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,586 | $7,700 | Not Implemented |
OK0940 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,509 | $14,500 | Not Implemented |
OK0940 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,330 | $17,442 | Not Implemented |
OK0940 # 08 Y:2016 | 08 | 2016 | OPTIMIZE PLANT POWER FACTOR | $5,900 | $38,500 | Not Implemented |
MZ0189 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,361 | $0 | Not Implemented |
MZ0189 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,835 | $5,500 | Not Implemented |