IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
SIC 302 Rubber And Plastics Footwear
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0189 # 07 Y:2001 07 2001 MINIMIZE WATER USAGE $1,633 $100 Implemented
BD0189 # 08 Y:2001 08 2001 MINIMIZE WATER USAGE $429 $1,550 Implemented
BD0189 # 10 Y:2001 10 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,750 $2,000 Implemented
KU0486 # 01 Y:1997 01 1997 INSULATE BARE EQUIPMENT $12,940 $11,560 Implemented
KU0486 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,710 $13,580 Implemented
KU0486 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,010 $790 Implemented
KU0486 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,990 $10,200 Implemented
KU0486 # 06 Y:1997 06 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,020 $2,980 Implemented
KU0486 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $1,560 $1,150 Implemented
MO0083 # 03 Y:1993 03 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,773 $75 Implemented
MO0083 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,699 $2,195 Implemented
GT0268 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $150 Implemented
GT0195 # 01 Y:1983 01 1983 INSULATE BARE EQUIPMENT $1,500 $530 Implemented
GT0195 # 02 Y:1983 02 1983 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,500 $500 Implemented
GT0195 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,975 $473 Implemented
GT0195 # 04 Y:1983 04 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,900 $4,730 Implemented