IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

553

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0037 # 04 Y:1988 04 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,970 $4,500 Implemented
GT0341 # 01 Y:1988 01 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $360 $550 Implemented
GT0341 # 02 Y:1988 02 1988 REDUCE VENTILATION AIR $2,230 $400 Implemented
GT0341 # 07 Y:1988 07 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,850 $400 Implemented
TN0336 # 02 Y:1988 02 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,139 $7,500 Implemented
TN0336 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,260 $830 Implemented
TN0336 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,494 $0 Implemented
TN0336 # 05 Y:1988 05 1988 ADJUST VENTS TO MINIMIZE ENERGY USE $890 $1,140 Implemented
TN0336 # 08 Y:1988 08 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $189 $180 Implemented
KU0231 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $847 $100 Implemented
KU0231 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $809 $40 Implemented
KU0231 # 05 Y:1987 05 1987 IMPROVE LUBRICATION PRACTICES $424 $600 Implemented
KU0231 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $212 $120 Implemented
KU0231 # 07 Y:1987 07 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $211 $0 Implemented
KU0231 # 09 Y:1987 09 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $-79 $0 Implemented
KU0225 # 01 Y:1987 01 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,036 $4,546 Implemented
KU0225 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $8,616 $500 Implemented
KU0225 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $13,017 $8,000 Implemented
KU0225 # 04 Y:1987 04 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $115 $0 Implemented
KU0225 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $942 $0 Implemented
KU0225 # 07 Y:1987 07 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $713 $50 Implemented
KU0225 # 10 Y:1987 10 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $115 $161 Implemented
KU0225 # 11 Y:1987 11 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,035 $0 Implemented
AT0064 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107 $108 Implemented
AT0064 # 02 Y:1987 02 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $303 $500 Implemented