IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,181

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0182 # 14 Y:2001 14 2001 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $200,000 $50,000 Not Implemented
BD0182 # 15 Y:2001 15 2001 CLEAR AND RENT EXISTING SPACE $57,528 $10,000 Not Implemented
SD0270 # 01 Y:2001 01 2001 REDESIGN PROCESS $182,520 $35,000 Implemented
SD0270 # 02 Y:2001 02 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,642 $15,000 Implemented
SD0270 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,189 $800 Implemented
SD0270 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,100 $90,000 Not Implemented
SD0270 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,077 $36,000 Implemented
SD0270 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,823 $103,000 Implemented
SD0270 # 07 Y:2001 07 2001 INSTALL SKYLIGHTS $7,878 $12,500 Implemented
SD0270 # 08 Y:2001 08 2001 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $983,363 $3,037,200 Not Implemented
SD0270 # 09 Y:2001 09 2001 RECOVER AND REUSE WASTE MATERIAL $32,522 $5,000 Implemented
SD0270 # 10 Y:2001 10 2001 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $3,170 $1,500 Implemented
SD0270 # 11 Y:2001 11 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $648 $0 Implemented
SD0270 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,910 $15,000 Implemented
SD0270 # 13 Y:2001 13 2001 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $35,880 $0 Implemented
SD0270 # 14 Y:2001 14 2001 PAY BILLS ON TIME TO AVOID LATE FEES $1,393 $0 Not Implemented
SD0270 # 15 Y:2001 15 2001 IMPROVE SPACE COMFORT CONDITIONING $65,375 $30,000 Not Implemented
SD0270 # 16 Y:2001 16 2001 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $21,296 $30,000 Not Implemented
IA0255 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,653 $3,653 Implemented
IA0255 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $675 $675 Implemented
IA0255 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $500 $500 Not Implemented
IA0255 # 04 Y:2000 04 2000 REDUCE HEAT GAIN BY WINDOW TINTING $1,735 $1,735 Implemented
IA0255 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $1,320 $1,320 Not Implemented
IA0255 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $1,059 $1,059 Not Implemented
IA0255 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $444 Not Implemented