Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2001
Principal Product Rubber Products
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $100,000,000-$500,000,000
# of Employees 263
Plant Area (Sq.Ft.) 366,000
Annual Production 84,000,000 Pounds
Production Hrs. Annual 6,360
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $361,346 18,917,438 kWh $0.02
Electricity Demand $653,325 46,500 kW-months/year $14.05
Natural Gas $378,567 64,741 MMBtu $5.85
TOTAL ENERGY COSTS $1,431,596
RECOMMENDED SAVINGS* $175,648 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $169,008
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Solid Waste (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Solid Waste (haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$124,956
Cost:
-
- - $128,136 9,120 - - - - - - - - $(-3,180) - -
-
kWh
$128,136
9,120
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$(-3,180)
-
$
02: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$18,573
Cost:
$6,262
- - - - - - - - $18,573 6,237 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$18,573
6,237
gal
-
-
lb
-
-
$
03: 3.4155 METER WASTE WATER Savings:
$14,438
Cost:
$500
- - - - - - $14,438 7,884,226 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,438
7,884,226
Tgal
-
-
gal
-
-
lb
-
-
$
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$5,700
Cost:
-
- - - - - - - - - - $5,700 30,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$5,700
30,000
lb
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,322
Cost:
$940
- - - - $6,322 1,090 - - - - - - - - -
-
kWh
-
-
kW-months/year
$6,322
1,090
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,846
Cost:
$5,628
$2,003 95,400 $843 60 - - - - - - - - - - $2,003
95,400
kWh
$843
60
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,873
Cost:
$2,400
$828 39,439 $1,045 74 - - - - - - - - - - $828
39,439
kWh
$1,045
74
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$940
Cost:
$2,256
$417 19,840 $523 37 - - - - - - - - - - $417
19,840
kWh
$523
37
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$175,648
Cost:
$17,986
$3,248 154,679 $130,547 9,291 $6,322 1,090 $14,438 7,884,226 $18,573 6,237 $5,700 30,000 $(-3,180) - $3,248
154,679
kWh
$130,547
9,291
kW-months/year
$6,322
1,090
MMBtu
$14,438
7,884,226
Tgal
$18,573
6,237
gal
$5,700
30,000
lb
$(-3,180)
-
$
TOTAL IMPLEMENTED Savings:
$169,008
Cost:
$15,730
$2,831 134,839 $130,024 9,254 $6,322 1,090 $14,438 7,884,226 $18,573 6,237 - - $(-3,180) - $2,831
134,839
kWh
$130,024
9,254
kW-months/year
$6,322
1,090
MMBtu
$14,438
7,884,226
Tgal
$18,573
6,237
gal
-
-
lb
$(-3,180)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Solid Waste (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Solid Waste (haz) Personnel Changes