Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0447 # 01 Y:2012 01 2012 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,132 $320 Not Implemented
SD0447 # 03 Y:2012 03 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,656 $38,885 Not Implemented
SD0447 # 06 Y:2012 06 2012 INSTALL SKYLIGHTS $4,128 $7,660 Not Implemented
SD0447 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $472 $640 Not Implemented
SD0447 # 02 Y:2012 02 2012 INSTALL SKYLIGHTS $14,679 $13,457 Not Implemented
SD0447 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,491 $12,231 Not Implemented
SD0444 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,992 $100 Implemented
SD0444 # 03 Y:2012 03 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,113 $272 Implemented
SD0444 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $1,892 $3,792 Not Implemented
SD0444 # 08 Y:2012 08 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,873 $20,250 Not Implemented
SD0444 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $740 $653 Implemented
SD0444 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,560 $14,000 Not Implemented
SD0444 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,090 $1,100 Not Implemented
SD0444 # 07 Y:2012 07 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,752 $68,368 Not Implemented
LM0112 # 06 Y:2006 06 2006 $1,348 $0 Implemented
LM0112 # 05 Y:2006 05 2006 $10,000 $0 Not Implemented
LM0112 # 04 Y:2006 04 2006 $433,948 $1,000 Not Implemented
LM0112 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,130 $8,728 Implemented
LM0112 # 02 Y:2006 02 2006 ADJUST VENTS TO MINIMIZE ENERGY USE $19,700 $0 Not Implemented
LM0112 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $200 Implemented
SD0376 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,390 $43,125 Not Implemented
SD0376 # 03 Y:2006 03 2006 AVOID FROST FORMATION ON EVAPORATORS $16,408 $31,225 Implemented
SD0376 # 01 Y:2006 01 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,522 $143,750 Not Implemented
SD0376 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,642 $0 Implemented
SD0376 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $997 $502 Implemented