IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3052 Rubber & Plastics Hose & Belting
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0082 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $866 $0 Implemented
IP0082 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $86 $0 Implemented
IP0082 # 13 Y:2017 13 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $627 Not Implemented
IP0082 # 12 Y:2017 12 2017 OPTIMIZE PLANT POWER FACTOR $7,316 $21,686 Implemented
IP0082 # 11 Y:2017 11 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,464 $9,078 Not Implemented
IP0082 # 10 Y:2017 10 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $134 $270 Implemented
IP0082 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,194 $19,486 Implemented
IP0082 # 08 Y:2017 08 2017 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $31,824 $38,940 Not Implemented
IP0082 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $3,769 $3,724 Implemented
IP0082 # 06 Y:2017 06 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,541 $1,698 Not Implemented
IP0082 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $24,829 $2,670 Implemented
IP0082 # 04 Y:2017 04 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,933 $3 Not Implemented
IP0082 # 03 Y:2017 03 2017 PAY BILLS ON TIME TO AVOID LATE FEES $828 $0 Implemented
UD0723 # 15 Y:2005 15 2005 UPGRADE CONTROLS ON COMPRESSORS $522 $0 Implemented
UD0723 # 14 Y:2005 14 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $840 $0 Not Implemented
UD0723 # 13 Y:2005 13 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,423 $500 Not Implemented
UD0723 # 12 Y:2005 12 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,164 $0 Implemented
UD0723 # 11 Y:2005 11 2005 INSULATE BARE EQUIPMENT $2,650 $2,629 Implemented
UD0723 # 10 Y:2005 10 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,730 $0 Not Implemented
UD0723 # 09 Y:2005 09 2005 REDUCE WATER USE WITH COUNTER CURRENT RINSING $3,070 $2,000 Not Implemented
UD0723 # 08 Y:2005 08 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,309 $0 Implemented
UD0723 # 07 Y:2005 07 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,573 $0 Implemented
UD0723 # 06 Y:2005 06 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,470 $0 Not Implemented
UD0723 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,126 $7,000 Implemented
UD0723 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,315 $13,340 Implemented