IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 3053 Gaskets, Packing And Sealing Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0485 # 02 Y:2014 02 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $9,166 $12,500 Not Implemented
WV0485 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,805 $3,000 Implemented
WV0485 # 09 Y:2014 09 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,922 $1,719 Not Implemented
WV0485 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,806 $4,815 Not Implemented
WV0485 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,038 $175 Implemented
WV0485 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $5,211 $2,981 Implemented
WV0485 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,703 $500 Implemented
WV0485 # 03 Y:2014 03 2014 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,371 $10,550 Not Implemented
WV0485 # 12 Y:2014 12 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $691 $426 Implemented
WV0485 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $1,516 $696 Implemented
WV0485 # 01 Y:2014 01 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,434 $1,000 Not Implemented
WV0485 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,635 $4,433 Not Implemented
WV0325 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,144 $662 Implemented
WV0325 # 11 Y:2005 11 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $775 $521 Not Implemented
WV0325 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $2,612 Implemented
WV0325 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $851 $426 Implemented
WV0325 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,637 $420 Implemented
WV0325 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $2,990 $257 Implemented
WV0325 # 06 Y:2005 06 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,529 $408 Not Implemented
WV0325 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,009 $0 Implemented
WV0325 # 04 Y:2005 04 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,050 $653 Implemented
WV0325 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $10,956 $11,550 Not Implemented
WV0325 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $16,088 $12,504 Not Implemented
WV0325 # 13 Y:2005 13 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $276 Not Implemented
WV0325 # 12 Y:2005 12 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $756 $260 Implemented