IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
Reset
SIC 3053 Gaskets, Packing And Sealing Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0112 # 04 Y:2006 04 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $433,948 $1,000 Not Implemented
LM0112 # 05 Y:2006 05 2006 MODIFY STARTUP/SHUTDOWN TIMES $10,000 $0 Not Implemented
LM0112 # 06 Y:2006 06 2006 ADD ADDITIONAL PRODUCTION SHIFT $1,348 $0 Implemented
SD0376 # 01 Y:2006 01 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,522 $143,750 Not Implemented
SD0376 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,390 $43,125 Not Implemented
SD0376 # 03 Y:2006 03 2006 AVOID FROST FORMATION ON EVAPORATORS $16,408 $31,225 Implemented
SD0376 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,062 $31,291 Implemented
SD0376 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,642 $0 Implemented
SD0376 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,516 $12,616 Not Implemented
SD0376 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $997 $502 Implemented
WV0325 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $16,088 $12,504 Not Implemented
WV0325 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $10,956 $11,550 Not Implemented
WV0325 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,144 $662 Implemented
WV0325 # 04 Y:2005 04 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,050 $653 Implemented
WV0325 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,009 $0 Implemented
WV0325 # 06 Y:2005 06 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,529 $408 Not Implemented
WV0325 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $2,990 $257 Implemented
WV0325 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,637 $420 Implemented
WV0325 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $851 $426 Implemented
WV0325 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $2,612 Implemented
WV0325 # 11 Y:2005 11 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $775 $521 Not Implemented
WV0325 # 12 Y:2005 12 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $756 $260 Implemented
WV0325 # 13 Y:2005 13 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $276 Not Implemented
NC0320 # 01 Y:2005 01 2005 INSTALL COMMON HEADER ON COMPRESSORS $7,563 $100 Implemented
NC0320 # 02 Y:2005 02 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,200 $100 Not Implemented