IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
Reset
SIC 3053 Gaskets, Packing And Sealing Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0320 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,402 $50 Implemented
NC0320 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $193 $421 Implemented
NC0320 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,900 $1,500 Not Implemented
NC0320 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $873 $100 Implemented
NC0320 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $902 $2,000 Implemented
NC0320 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $264 $25 Implemented
MA0581 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $165,668 $1,327,403 Not Implemented
MA0581 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,700 $18,200 Implemented
MA0581 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,480 $157,905 Not Implemented
MA0581 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,652 $18,550 Implemented
MA0581 # 05 Y:2005 05 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,531 $17,435 Not Implemented
MA0581 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,002 $29,888 Not Implemented
MA0581 # 07 Y:2005 07 2005 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $10,812 $5,328 Implemented
MA0581 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $10,675 $4,675 Implemented
MA0581 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,508 $160 Implemented
MA0581 # 10 Y:2005 10 2005 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $5,166 $3,100 Implemented
MA0581 # 11 Y:2005 11 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,467 $8,300 Implemented
MA0581 # 12 Y:2005 12 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,134 $6,429 Not Implemented
UM0267 # 01 Y:2004 01 2004 RECOVER AND REUSE WASTE MATERIAL $27,320 $10,000 Not Implemented
UM0267 # 02 Y:2004 02 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,684 $2,400 Not Implemented
UM0267 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,675 $20,137 Implemented
UM0267 # 04 Y:2004 04 2004 OPTIMIZE PLANT POWER FACTOR $11,902 $21,150 Implemented
UM0267 # 05 Y:2004 05 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,938 $2,615 Implemented
UM0267 # 06 Y:2004 06 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,119 $1,300 Not Implemented
UM0267 # 07 Y:2004 07 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,390 $200 Not Implemented