Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
74
matching recommendationsSIC | 3053 | Gaskets, Packing And Sealing Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0447 # 01 Y:2012 | 01 | 2012 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,132 | $320 | Not Implemented |
SD0447 # 03 Y:2012 | 03 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,656 | $38,885 | Not Implemented |
SD0447 # 06 Y:2012 | 06 | 2012 | INSTALL SKYLIGHTS | $4,128 | $7,660 | Not Implemented |
SD0447 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $472 | $640 | Not Implemented |
SD0447 # 02 Y:2012 | 02 | 2012 | INSTALL SKYLIGHTS | $14,679 | $13,457 | Not Implemented |
SD0447 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,491 | $12,231 | Not Implemented |
SD0444 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,992 | $100 | Implemented |
SD0444 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,113 | $272 | Implemented |
SD0444 # 06 Y:2012 | 06 | 2012 | INSTALL OCCUPANCY SENSORS | $1,892 | $3,792 | Not Implemented |
SD0444 # 08 Y:2012 | 08 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,873 | $20,250 | Not Implemented |
SD0444 # 04 Y:2012 | 04 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $740 | $653 | Implemented |
SD0444 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,560 | $14,000 | Not Implemented |
SD0444 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,090 | $1,100 | Not Implemented |
SD0444 # 07 Y:2012 | 07 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,752 | $68,368 | Not Implemented |
LM0112 # 06 Y:2006 | 06 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $1,348 | $0 | Implemented |
LM0112 # 05 Y:2006 | 05 | 2006 | MODIFY STARTUP/SHUTDOWN TIMES | $10,000 | $0 | Not Implemented |
LM0112 # 04 Y:2006 | 04 | 2006 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $433,948 | $1,000 | Not Implemented |
LM0112 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,130 | $8,728 | Implemented |
LM0112 # 02 Y:2006 | 02 | 2006 | ADJUST VENTS TO MINIMIZE ENERGY USE | $19,700 | $0 | Not Implemented |
LM0112 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $615 | $200 | Implemented |
SD0376 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,390 | $43,125 | Not Implemented |
SD0376 # 03 Y:2006 | 03 | 2006 | AVOID FROST FORMATION ON EVAPORATORS | $16,408 | $31,225 | Implemented |
SD0376 # 01 Y:2006 | 01 | 2006 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $46,522 | $143,750 | Not Implemented |
SD0376 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,642 | $0 | Implemented |
SD0376 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $997 | $502 | Implemented |