IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

977

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0597 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,612 $25,370 Implemented
TR0041 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $28,659 $27,941 Implemented
TR0041 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $17,496 $200,000 Implemented
TR0041 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,679 $3,857 Implemented
UU0219 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,112 $13,345 Implemented
NL0078 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,587 $2,300 Implemented
NL0078 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $812 $2,080 Implemented
NL0078 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $658 $80 Implemented
NL0078 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,358 $17,280 Implemented
NL0078 # 01 Y:2023 01 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $31,345 $100,000 Implemented
NL0078 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $415 Implemented
NL0078 # 08 Y:2023 08 2023 METER WASTE WATER $128 $250 Implemented
TR0037 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,104 $9,500 Implemented
TR0037 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,119 $1,204 Implemented
TR0037 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $62,708 $9,722 Implemented
MA0853 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,613 $59,377 Implemented
MA0853 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,336 $24,300 Implemented
MA0853 # 03 Y:2023 03 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,672 $30,500 Implemented
MA0853 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,202 $18,988 Implemented
MA0848 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,335 $15,950 Implemented
MA0848 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,130 $26,000 Implemented
UL2211 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $61,887 $45,461 Implemented
UL2211 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,815 $0 Implemented
UL2211 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,765 $0 Implemented
AM0853 # 07 Y:2022 07 2022 REPAIR OR REPLACE STEAM TRAPS $2,070 $275 Implemented