IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

977

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0183 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $17,887 $18,770 Implemented
ND0183 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,708 $200 Implemented
ND0183 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $689 $149 Implemented
ND0183 # 10 Y:1994 10 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $255 $430 Implemented
SD0078 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,072 $2,240 Implemented
SD0078 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,864 $100 Implemented
SD0078 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,867 $2,438 Implemented
SD0078 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $295 $104 Implemented
SD0078 # 11 Y:1994 11 1994 INSTALL OCCUPANCY SENSORS $1,241 $800 Implemented
ND0174 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,033 $3,875 Implemented
ND0174 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,131 $1,061 Implemented
AM0188 # 02 Y:1993 02 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,390 $2,890 Implemented
AM0188 # 03 Y:1993 03 1993 INSTALL TIMERS AND/OR THERMOSTATS $2,360 $1,040 Implemented
AM0188 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $400 Implemented
AM0188 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $595 $1,790 Implemented
WI0168 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,008 $500 Implemented
WI0168 # 06 Y:1993 06 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $448 $0 Implemented
WI0168 # 09 Y:1993 09 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $190 $640 Implemented
KU0389 # 01 Y:1992 01 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $12,201 $0 Implemented
KU0389 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $1,546 $1,000 Implemented
KU0389 # 04 Y:1992 04 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,964 $2,250 Implemented
MA0228 # 02 Y:1991 02 1991 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $8,647 $5,000 Implemented
MA0228 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,534 $2,000 Implemented
MA0228 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $891 $400 Implemented
MA0228 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $458 $430 Implemented