IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

986

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0055 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $287 $270 Implemented
LT0055 # 03 Y:1986 03 1986 USE OPTIMUM THICKNESS INSULATION $4,130 $5,659 Implemented
LT0055 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,847 $16,480 Implemented
MA0054 # 01 Y:1986 01 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $730 $1,200 Implemented
MA0054 # 02 Y:1986 02 1986 REPAIR AND ELIMINATE STEAM LEAKS $1,260 $600 Implemented
MA0054 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $676 $0 Implemented
MA0054 # 04 Y:1986 04 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $811 $0 Implemented
ST0040 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,017 $1,181 Implemented
ST0040 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,026 $64 Implemented
ST0040 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $60 Implemented
ST0040 # 04 Y:1985 04 1985 USE COMPRESSOR AIR FILTERS $1,245 $0 Implemented
ST0040 # 05 Y:1985 05 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,896 $1,900 Implemented
ST0040 # 07 Y:1985 07 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $1,091 $1,422 Implemented
ST0040 # 08 Y:1985 08 1985 COVER OPEN TANKS $417 $420 Implemented
ST0040 # 10 Y:1985 10 1985 REPAIR AND ELIMINATE STEAM LEAKS $7,660 $100 Implemented
ST0040 # 11 Y:1985 11 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,387 $61 Implemented
ST0040 # 12 Y:1985 12 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,337 $537 Implemented
ST0040 # 14 Y:1985 14 1985 INSTALL STORM WINDOWS AND DOORS $963 $500 Implemented
LT0027 # 01 Y:1985 01 1985 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $76,200 $15,600 Implemented
LT0027 # 03 Y:1985 03 1985 REPAIR AND ELIMINATE STEAM LEAKS $1,218 $45 Implemented
GT0258 # 01 Y:1985 01 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,573 $2,500 Implemented
GT0258 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,450 $2,602 Implemented
GT0258 # 03 Y:1985 03 1985 REDESIGN PROCESS $45,000 $22,560 Implemented
GT0258 # 04 Y:1985 04 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,613 $6,000 Implemented
GT0258 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,370 $4,472 Implemented