IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2211 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,815 $0 Implemented
UL2211 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $61,887 $45,461 Implemented
UL2211 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,765 $0 Implemented
UK1610 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,688 $4,985 Implemented
UK1610 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $374 $148 Implemented
UK1610 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $525 $0 Implemented
UK1610 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $196 $500 Implemented
UK1610 # 08 Y:2016 08 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,083 $500 Implemented
UK1316 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,600 $0 Implemented
UK1316 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $9,386 $1,600 Implemented
UK1316 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $2,534 $3,475 Implemented
UK1316 # 08 Y:2013 08 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $716 $840 Implemented
TN0293 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $13,716 $2,811 Implemented
TN0293 # 05 Y:1986 05 1986 TURN OFF EQUIPMENT WHEN NOT IN USE $640 $0 Implemented
TN0293 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $625 $180 Implemented