Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,116
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0585 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,658 | $9,998 | Implemented |
WV0585 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,160 | $1,100 | Implemented |
WV0585 # 08 Y:2019 | 08 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $5,125 | $1,450 | Implemented |
WV0585 # 09 Y:2019 | 09 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,529 | $250 | Not Implemented |
WV0585 # 10 Y:2019 | 10 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,014 | $1,303 | Implemented |
TR0014 # 01 Y:2019 | 01 | 2019 | PAY UTILITY BILLS ON TIME | $2,781 | $0 | Implemented |
TR0014 # 02 Y:2019 | 02 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,582 | $0 | Implemented |
TR0014 # 03 Y:2019 | 03 | 2019 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $9,971 | $8,500 | Implemented |
TR0014 # 04 Y:2019 | 04 | 2019 | METER WASTE WATER | $719 | $1,511 | Implemented |
TR0014 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,996 | $8,838 | Implemented |
SD0575 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,276 | $7,083 | Not Implemented |
SD0575 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,233 | $600 | Implemented |
SD0575 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,476 | $4,242 | Not Implemented |
SD0575 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $718 | $0 | Implemented |
SD0575 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $441 | $540 | Not Implemented |
SD0575 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $142 | $218 | Not Implemented |
NL0028 # 01 Y:2019 | 01 | 2019 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $23,879 | $45,000 | Not Implemented |
NL0028 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,950 | $52,450 | Implemented |
NL0028 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $3,028 | $4,631 | Implemented |
NL0028 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,582 | $1,600 | Implemented |
NL0028 # 05 Y:2019 | 05 | 2019 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $132 | $474 | Not Implemented |
UD0994 # 01 Y:2019 | 01 | 2019 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $100,170 | $0 | Not Implemented |
UD0994 # 02 Y:2019 | 02 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,091 | $700 | Not Implemented |
UD0994 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,649 | $33,788 | Not Implemented |
UD0994 # 04 Y:2019 | 04 | 2019 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $248,034 | $337,264 | Implemented |