IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,116

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0585 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,658 $9,998 Implemented
WV0585 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,160 $1,100 Implemented
WV0585 # 08 Y:2019 08 2019 DEVELOP A REPAIR/REPLACE POLICY $5,125 $1,450 Implemented
WV0585 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,529 $250 Not Implemented
WV0585 # 10 Y:2019 10 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,014 $1,303 Implemented
TR0014 # 01 Y:2019 01 2019 PAY UTILITY BILLS ON TIME $2,781 $0 Implemented
TR0014 # 02 Y:2019 02 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,582 $0 Implemented
TR0014 # 03 Y:2019 03 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,971 $8,500 Implemented
TR0014 # 04 Y:2019 04 2019 METER WASTE WATER $719 $1,511 Implemented
TR0014 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,996 $8,838 Implemented
SD0575 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,276 $7,083 Not Implemented
SD0575 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,233 $600 Implemented
SD0575 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,476 $4,242 Not Implemented
SD0575 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $718 $0 Implemented
SD0575 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $441 $540 Not Implemented
SD0575 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $142 $218 Not Implemented
NL0028 # 01 Y:2019 01 2019 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $23,879 $45,000 Not Implemented
NL0028 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,950 $52,450 Implemented
NL0028 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $3,028 $4,631 Implemented
NL0028 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,582 $1,600 Implemented
NL0028 # 05 Y:2019 05 2019 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $132 $474 Not Implemented
UD0994 # 01 Y:2019 01 2019 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $100,170 $0 Not Implemented
UD0994 # 02 Y:2019 02 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,091 $700 Not Implemented
UD0994 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,649 $33,788 Not Implemented
UD0994 # 04 Y:2019 04 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $248,034 $337,264 Implemented