IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,163

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0629 # 01 Y:2001 01 2001 MOVE PRODUCT USING MECHANICAL MEANS $21,879 $25,000 Not Implemented
UD0629 # 02 Y:2001 02 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $18,079 $15,000 n/a
UD0629 # 03 Y:2001 03 2001 REDUCE SCRAP PRODUCTION $15,862 $6,000 Not Implemented
UD0629 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,324 $0 Not Implemented
UD0629 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $5,835 $1,760 Not Implemented
UD0629 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,200 $1,500 Not Implemented
UD0629 # 07 Y:2001 07 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,907 $0 Implemented
UD0629 # 08 Y:2001 08 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,128 $0 Not Implemented
UD0629 # 09 Y:2001 09 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $982 $250 Not Implemented
UD0629 # 10 Y:2001 10 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $628 $300 Not Implemented
WV0218 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $188 Not Implemented
WV0218 # 02 Y:2001 02 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,768 $13,800 Implemented
WV0218 # 03 Y:2001 03 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,519 $1,362 Implemented
WV0218 # 04 Y:2001 04 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $121 $60 Implemented
WV0218 # 05 Y:2001 05 2001 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $2,714 $2,520 Not Implemented
WV0218 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,713 $1,440 Implemented
WV0218 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $1,985 $276 Implemented
WV0218 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $3,625 $730 Implemented
WV0218 # 09 Y:2001 09 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,088 $1,200 Implemented
WV0218 # 10 Y:2001 10 2001 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $5,940 $0 Not Implemented
WV0218 # 11 Y:2001 11 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $18,480 $9,000 Implemented
WV0218 # 12 Y:2001 12 2001 AUTOMATE FINISHING PROCESS $24,960 $1,600 Not Implemented
HO0238 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $2,289 Not Implemented
HO0238 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $736 $800 Not Implemented
HO0238 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $702 $60 Implemented