Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,033

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0004 # 02 Y:1984 02 1984 INSTALL SET-BACK TIMERS $5,293 $500 Implemented
MA0004 # 03 Y:1984 03 1984 REDUCE VENTILATION AIR $33,473 $1,896 Implemented
MA0004 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,455 $200 Implemented
TN0217 # 01 Y:1984 01 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $51,259 $42,740 Not Implemented
TN0217 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $24,926 $1,300 Implemented
TN0217 # 03 Y:1984 03 1984 REPAIR AND ELIMINATE STEAM LEAKS $22,604 $1,425 Implemented
TN0217 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,424 $1,200 Implemented
TN0217 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,488 $0 Not Implemented
TN0217 # 06 Y:1984 06 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,447 $0 Implemented
TN0217 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,610 $50 Implemented
UD0114 # 01 Y:1984 01 1984 UPGRADE OBSOLETE EQUIPMENT $20,480 $5,070 Implemented
UD0114 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,818 $900 Implemented
UD0114 # 03 Y:1984 03 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $852 $0 Not Implemented
UD0114 # 04 Y:1984 04 1984 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,038 $4,000 Implemented
UD0114 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,377 $33,750 Implemented
UD0114 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,899 $0 Implemented
OK0094 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $764 $183 Not Implemented
OK0094 # 02 Y:1983 02 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19 $45 Not Implemented
OK0094 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $988 $800 Not Implemented
OK0094 # 04 Y:1983 04 1983 REPAIR AND ELIMINATE STEAM LEAKS $2,438 $1,127 Implemented
OK0094 # 05 Y:1983 05 1983 OPTIMIZE PLANT POWER FACTOR $728 $545 Not Implemented
OK0094 # 06 Y:1983 06 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $263 $200 Implemented
OK0094 # 07 Y:1983 07 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $24 $30 Not Implemented
OK0094 # 08 Y:1983 08 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $156 $47 Implemented
OK0094 # 09 Y:1983 09 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $87 $51 Implemented