Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0078 # 01 Y:2023 | 01 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $31,345 | $100,000 | Implemented |
NL0078 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $812 | $2,080 | Implemented |
NL0078 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,587 | $2,300 | Implemented |
NL0078 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $6,550 | $20,000 | Not Implemented |
NL0078 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $658 | $80 | Implemented |
NL0078 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $270 | $415 | Implemented |
NL0078 # 08 Y:2023 | 08 | 2023 | METER WASTE WATER | $128 | $250 | Implemented |
NL0078 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,358 | $17,280 | Implemented |
NL0028 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $3,028 | $4,631 | Implemented |
NL0028 # 01 Y:2019 | 01 | 2019 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $23,879 | $45,000 | Not Implemented |
NL0028 # 05 Y:2019 | 05 | 2019 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $132 | $474 | Not Implemented |
NL0028 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,950 | $52,450 | Implemented |
NL0028 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,582 | $1,600 | Implemented |
IA0452 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,118 | $824 | Not Implemented |
IA0452 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,308 | $98 | Implemented |
IA0452 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $244 | $285 | Implemented |
IA0452 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $509 | $20 | Implemented |
IA0452 # 05 Y:2010 | 05 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $482 | $769 | Implemented |
IA0452 # 06 Y:2010 | 06 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,217 | $60 | Implemented |
IA0452 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,294 | $8,619 | Implemented |
IA0452 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $1,246 | $1,600 | Implemented |
IA0441 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,456 | $650 | Not Implemented |
IA0441 # 04 Y:2009 | 04 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,935 | $825 | Not Implemented |
IA0441 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,444 | $702 | Implemented |
IA0441 # 02 Y:2009 | 02 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,759 | $17,051 | Not Implemented |