IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0848 # 02 Y:2023 02 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $26,885 $30,500 Not Implemented
MA0848 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,335 $15,950 Implemented
MA0848 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $285,734 $2,502,664 Not Implemented
MA0848 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,130 $26,000 Implemented
MA0848 # 05 Y:2023 05 2023 ADJUST VENTS TO MINIMIZE ENERGY USE $5,306 $6,125 Not Implemented
MA0582 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,153 $0 Implemented
MA0582 # 03 Y:2005 03 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,630 $6,540 Implemented
MA0582 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,163 $86,315 Implemented
MA0582 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,599 $2,010 Implemented
MA0582 # 05 Y:2005 05 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,602 $77,760 Not Implemented
MA0582 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $98,511 $312,103 Not Implemented
MA0582 # 10 Y:2005 10 2005 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,584 $1,300 Implemented
MA0582 # 09 Y:2005 09 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,540 $800 Implemented
MA0582 # 08 Y:2005 08 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,340 $25,150 Implemented
MA0582 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,815 $7,660 Implemented
MA0561 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,006 $25,500 Implemented
MA0561 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,473 $2,750 Implemented
MA0561 # 04 Y:2004 04 2004 REDUCE VENTILATION AIR $6,815 $4,530 Implemented
MA0561 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $3,147 $735 Implemented
MA0561 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,624 $4,550 Implemented
MA0561 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,924 $75,720 Implemented
MA0526 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,324 $11,500 n/a
MA0526 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,169 $0 Implemented
MA0526 # 06 Y:2003 06 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,179 $2,970 Not Implemented
MA0526 # 01 Y:2003 01 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $29,601 $51,300 n/a