IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0140 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $0 Not Implemented
RU0140 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $471 $272 Not Implemented
RU0140 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,885 $500 Not Implemented
RU0140 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $892 $30 Not Implemented
RU0140 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,314 $201 Not Implemented
RU0082 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,747 $7,500 Not Implemented
RU0082 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,108 $500 Not Implemented
RU0082 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,942 $14,350 Not Implemented
RU0082 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,184 $0 Not Implemented
RU0082 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,107 $72 Not Implemented
RU0082 # 01 Y:1990 01 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,625 $0 Not Implemented
RU0020 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,078 $500 Not Implemented
RU0020 # 03 Y:1988 03 1988 IMPROVE LUBRICATION PRACTICES $1,062 $0 Implemented
RU0020 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,362 $8,250 Implemented
RU0020 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,168 $132 Implemented
ST0040 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,017 $1,181 Implemented
ST0040 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,026 $64 Implemented
ST0040 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $60 Implemented
ST0040 # 04 Y:1985 04 1985 USE COMPRESSOR AIR FILTERS $1,245 $0 Implemented
ST0040 # 05 Y:1985 05 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,896 $1,900 Implemented
ST0040 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,761 $1,900 Not Implemented
ST0040 # 07 Y:1985 07 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $1,091 $1,422 Implemented
ST0040 # 08 Y:1985 08 1985 COVER OPEN TANKS $417 $420 Implemented
ST0040 # 09 Y:1985 09 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $217 $400 Not Implemented
ST0040 # 10 Y:1985 10 1985 REPAIR AND ELIMINATE STEAM LEAKS $7,660 $100 Implemented