IAC Assessment: ST0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1985
Principal Product CUSTOM MOLDED RUBBER PDT
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 0
Annual Production 300,000 Pounds
Production Hrs. Annual 2,925
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $206,163 1,737,104 kWh $0.12
Natural Gas $19,873 3,805 MMBtu $5.22
Fuel Oil #2 $166,684 26,040 MMBtu $6.40
TOTAL ENERGY COSTS $392,720
RECOMMENDED SAVINGS* $74,861 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,769
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,017
Cost:
$1,181
$10,017 84,408 - - - - - - $10,017
84,408
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,026
Cost:
$64
$3,026 25,498 - - - - - - $3,026
25,498
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$730
Cost:
$60
$730 6,155 - - - - - - $730
6,155
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$1,245
Cost:
-
$1,565 13,189 - - - - $(-320) - $1,565
13,189
kWh
-
-
MMBtu
-
-
MMBtu
$(-320)
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,896
Cost:
$1,900
$9,896 - - - - - - - $9,896
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,761
Cost:
$1,900
- - - - $2,761 430 - - -
-
kWh
-
-
MMBtu
$2,761
430
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,091
Cost:
$1,422
- - - - $1,091 170 - - -
-
kWh
-
-
MMBtu
$1,091
170
MMBtu
-
-
$
08: 2.2514 COVER OPEN TANKS Savings:
$417
Cost:
$420
- - - - $417 65 - - -
-
kWh
-
-
MMBtu
$417
65
MMBtu
-
-
$
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$217
Cost:
$400
$243 2,052 $(-26) (-5) - - - - $243
2,052
kWh
$(-26)
(-5)
MMBtu
-
-
MMBtu
-
-
$
10: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$7,660
Cost:
$100
- - - - $7,660 1,195 - - -
-
kWh
-
-
MMBtu
$7,660
1,195
MMBtu
-
-
$
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,387
Cost:
$61
- - - - $1,387 216 - - -
-
kWh
-
-
MMBtu
$1,387
216
MMBtu
-
-
$
12: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,337
Cost:
$537
- - - - $15,337 2,389 - - -
-
kWh
-
-
MMBtu
$15,337
2,389
MMBtu
-
-
$
13: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,211
Cost:
$3,000
- - - - $8,211 1,279 - - -
-
kWh
-
-
MMBtu
$8,211
1,279
MMBtu
-
-
$
14: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$963
Cost:
$500
- - - - $963 150 - - -
-
kWh
-
-
MMBtu
$963
150
MMBtu
-
-
$
15: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$11,903
Cost:
$675
- - - - $11,903 1,854 - - -
-
kWh
-
-
MMBtu
$11,903
1,854
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$74,861
Cost:
$12,220
$25,477 131,302 $(-26) (-5) $49,730 7,748 $(-320) - $25,477
131,302
kWh
$(-26)
(-5)
MMBtu
$49,730
7,748
MMBtu
$(-320)
-
$
TOTAL IMPLEMENTED Savings:
$51,769
Cost:
$6,245
$25,234 129,250 - - $26,855 4,185 $(-320) - $25,234
129,250
kWh
-
-
MMBtu
$26,855
4,185
MMBtu
$(-320)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes