Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
16
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0585 # 01 Y:2019 | 01 | 2019 | RECYCLE WHITE WATER | $175,950 | $82,900 | Not Implemented |
WV0585 # 02 Y:2019 | 02 | 2019 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $33,124 | $77,800 | Not Implemented |
WV0585 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $30,373 | $10,462 | Not Implemented |
WV0585 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $18,306 | $16,750 | Not Implemented |
WV0585 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,261 | $0 | Implemented |
WV0585 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,658 | $9,998 | Implemented |
WV0585 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,160 | $1,100 | Implemented |
WV0585 # 08 Y:2019 | 08 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $5,125 | $1,450 | Implemented |
WV0585 # 09 Y:2019 | 09 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,529 | $250 | Not Implemented |
WV0585 # 10 Y:2019 | 10 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,014 | $1,303 | Implemented |
UD0994 # 01 Y:2019 | 01 | 2019 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $100,170 | $0 | Not Implemented |
UD0994 # 02 Y:2019 | 02 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,091 | $700 | Not Implemented |
UD0994 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,649 | $33,788 | Not Implemented |
UD0994 # 04 Y:2019 | 04 | 2019 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $248,034 | $337,264 | Implemented |
UD0994 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,349 | $10,250 | Not Implemented |
UD0994 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,968 | $8,550 | Not Implemented |