Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0038 # 07 Y:2024 | 07 | 2024 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $10,304 | $24,675 | n/a |
CC0038 # 06 Y:2024 | 06 | 2024 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $8,129 | $6,200 | n/a |
CC0038 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $143,864 | $738,776 | n/a |
CC0038 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $34,175 | $0 | n/a |
CC0038 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,339 | $20,000 | n/a |
CC0038 # 02 Y:2024 | 02 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $48,942 | $14,000 | n/a |
CC0038 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,471 | $1,560 | n/a |
CC0038 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $68,643 | $40,000 | n/a |
NC0641 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,143 | $35,000 | Implemented |
NC0641 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,164 | $120 | Not Implemented |
NC0641 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,183 | $16,246 | Not Implemented |
NC0641 # 02 Y:2019 | 02 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,554 | $21,000 | Not Implemented |
NC0399 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $200 | Implemented |
NC0399 # 01 Y:2010 | 01 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,597 | $100 | Implemented |
NC0399 # 06 Y:2010 | 06 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $7,151 | $23,576 | Implemented |
NC0399 # 03 Y:2010 | 03 | 2010 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $40,261 | $0 | Not Implemented |
NC0399 # 04 Y:2010 | 04 | 2010 | INSULATE BARE EQUIPMENT | $1,429 | $5,438 | Implemented |
NC0399 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,471 | $0 | Implemented |
NC0399 # 10 Y:2010 | 10 | 2010 | INSULATE BARE EQUIPMENT | $1,592 | $2,600 | Implemented |
NC0399 # 07 Y:2010 | 07 | 2010 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $6,943 | $8,852 | Not Implemented |
NC0399 # 08 Y:2010 | 08 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,744 | $1,550 | Implemented |
NC0399 # 09 Y:2010 | 09 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,805 | $6,000 | Implemented |
OD0003 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,798 | $29,976 | Not Implemented |
OD0003 # 02 Y:1994 | 02 | 1994 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,032 | $1,925 | Not Implemented |
OD0003 # 05 Y:1994 | 05 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $717 | $1,365 | Not Implemented |