Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
68
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0629 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,784 | $2,500 | Implemented |
GT0629 # 02 Y:1997 | 02 | 1997 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $525 | $150 | Implemented |
GT0629 # 04 Y:1997 | 04 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $402 | $965 | Implemented |
GT0629 # 03 Y:1997 | 03 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,595 | $5,050 | Not Implemented |
GT0629 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $7,415 | $800 | Implemented |
GT0629 # 08 Y:1997 | 08 | 1997 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $153,375 | $62,650 | Not Implemented |
GT0629 # 07 Y:1997 | 07 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,680 | $900 | Implemented |
GT0629 # 05 Y:1997 | 05 | 1997 | MINIMIZE WATER USAGE | $13,141 | $0 | Implemented |
AR0124 # 03 Y:1997 | 03 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,547 | $605 | Not Implemented |
AR0124 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,334 | $586 | Not Implemented |
AR0124 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $757 | $120 | Implemented |
AR0124 # 04 Y:1997 | 04 | 1997 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,617 | $100 | Implemented |
AR0124 # 05 Y:1997 | 05 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,903 | $0 | Implemented |
AR0124 # 09 Y:1997 | 09 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,514 | $0 | Not Implemented |
AR0124 # 10 Y:1997 | 10 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $26,000 | $2,500 | Not Implemented |
AR0124 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $376 | $100 | Implemented |
AR0124 # 07 Y:1997 | 07 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,103 | $1,238 | Implemented |
AR0124 # 08 Y:1997 | 08 | 1997 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $950 | $100 | Implemented |
MS0096 # 02 Y:1997 | 02 | 1997 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $13,603 | $17,448 | Implemented |
MS0096 # 03 Y:1997 | 03 | 1997 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $19,264 | $5,738 | Implemented |
MS0096 # 04 Y:1997 | 04 | 1997 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $346,828 | $10,000 | Not Implemented |
MS0096 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,195 | $7,228 | Implemented |
UD0523 # 01 Y:1997 | 01 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $34,683 | $0 | Implemented |
UD0523 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,766 | $4,000 | Not Implemented |
UD0523 # 02 Y:1997 | 02 | 1997 | REVISE RAW MATERIAL SPECS | $203,890 | $100,000 | Implemented |