Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
68
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0390 # 16 Y:2010 | 16 | 2010 | INSTALL OCCUPANCY SENSORS | $2,946 | $75 | Not Implemented |
SF0390 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,023 | $1,764 | Implemented |
SF0390 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $4,611 | $2,176 | Not Implemented |
SF0390 # 07 Y:2010 | 07 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,024 | $5,560 | Implemented |
SF0390 # 01 Y:2010 | 01 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,708 | $0 | Implemented |
SF0390 # 06 Y:2010 | 06 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,991 | $789 | Implemented |
SF0390 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $24,404 | $7,250 | Implemented |
SF0390 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,828 | $0 | Implemented |
SF0390 # 09 Y:2010 | 09 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $326 | $261 | Not Implemented |
SF0390 # 03 Y:2010 | 03 | 2010 | AIR CONDITION ONLY SPACE NECESSARY | $14,706 | $3,207 | Implemented |
SF0390 # 18 Y:2010 | 18 | 2010 | OPTIMIZE PLANT POWER FACTOR | $5,696 | $21,908 | Implemented |
SF0390 # 10 Y:2010 | 10 | 2010 | INSULATE BARE EQUIPMENT | $996 | $821 | Not Implemented |
SF0390 # 12 Y:2010 | 12 | 2010 | USE COMPRESSOR AIR FILTERS | $2,168 | $3,000 | Implemented |
SF0390 # 15 Y:2010 | 15 | 2010 | USE PHOTOCELL CONTROLS | $1,030 | $2,587 | Implemented |
SF0390 # 17 Y:2010 | 17 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,167 | $17,310 | Not Implemented |
SF0390 # 13 Y:2010 | 13 | 2010 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $39,251 | $58,106 | Implemented |
SF0390 # 14 Y:2010 | 14 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $846 | $1,500 | Not Implemented |
SF0390 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,039 | $2,749 | Implemented |
LL0334 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,974 | $9,555 | Not Implemented |
LL0334 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $1,325 | $570 | Not Implemented |
LL0334 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $522 | $630 | Not Implemented |
LL0334 # 07 Y:2010 | 07 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $603 | $290 | Not Implemented |
LL0334 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $50,263 | $9,960 | Not Implemented |
LL0334 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38 | $19 | Not Implemented |
LL0334 # 02 Y:2010 | 02 | 2010 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $113,009 | $24,500 | Not Implemented |