IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

554

matching recommendations
Reset
SIC 3061 Mechanical Rubber Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0863 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $557 $0 Implemented
UD0863 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,871 $8,000 Not Implemented
UD0863 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,285 $9,900 Not Implemented
UD0863 # 07 Y:2012 07 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,249 $0 Implemented
UD0863 # 08 Y:2012 08 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,548 $2,000 Not Implemented
UD0863 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,856 $1,000 Implemented
UD0863 # 10 Y:2012 10 2012 REPAIR OR REPLACE STEAM TRAPS $13,284 $0 Implemented
UD0863 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $10,008 $2,600 Implemented
UD0863 # 12 Y:2012 12 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $4,619 $12,800 Not Implemented
UD0863 # 13 Y:2012 13 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $43,532 $0 Implemented
UD0863 # 14 Y:2012 14 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $23,215 $14,000 Not Implemented
OK0825 # 01 Y:2012 01 2012 REPLACE BOILER $228,516 $1,085,000 Not Implemented
OK0825 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,541 $68,775 Implemented
OK0825 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $194 $3,150 Not Implemented
OK0825 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,699 $65,000 Not Implemented
OK0825 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,478 $1,500 Implemented
OK0825 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,119 $538 Implemented
OK0825 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,300 $450 Not Implemented
OK0825 # 08 Y:2012 08 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $62,755 $31,500 Not Implemented
OK0825 # 09 Y:2012 09 2012 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $15,683 $15,683 Not Implemented
OK0825 # 10 Y:2012 10 2012 INSTALL SET-BACK TIMERS $929 $937 Not Implemented
OK0825 # 11 Y:2012 11 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,292 $406,800 Not Implemented
OK0825 # 12 Y:2012 12 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,335 $0 Not Implemented
UA0076 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $7,334 $13,455 Not Implemented
UA0076 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,762 $6,195 Not Implemented