IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

554

matching recommendations
Reset
SIC 3061 Mechanical Rubber Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0313 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,207 $340 n/a
TT0313 # 12 Y:2024 12 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $81,048 $301,095 n/a
TT0313 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,255 $2,625 n/a
TT0313 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $640 $87 n/a
TT0313 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,724 $2,600 n/a
TT0313 # 11 Y:2024 11 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $92,752 $120,000 n/a
CC0038 # 07 Y:2024 07 2024 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,304 $24,675 n/a
CC0038 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,471 $1,560 n/a
CC0038 # 06 Y:2024 06 2024 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $8,129 $6,200 n/a
CC0038 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $143,864 $738,776 n/a
CC0038 # 04 Y:2024 04 2024 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $34,175 $0 n/a
CC0038 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,339 $20,000 n/a
CC0038 # 02 Y:2024 02 2024 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $48,942 $14,000 n/a
CC0038 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,643 $40,000 n/a
UL2317 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $16,039 $148,666 n/a
UL2317 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $6,865 $9,100 n/a
UL2317 # 04 Y:2023 04 2023 INSTALL SPECTRAL REFLECTORS / DELAMP $2,720 $500 n/a
UL2317 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $2,077 n/a
UL2317 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,159 $0 n/a
UD1069 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $1,799 $0 Not Implemented
UD1069 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,372 $1,389 Implemented
UD1069 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,796 $300 Implemented
UD1069 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,461 $952 Implemented
UD1069 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,894 $1,403 Implemented
UD1069 # 08 Y:2023 08 2023 COVER OPEN TANKS $42 $2,000 Implemented