IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

554

matching recommendations
Reset
SIC 3061 Mechanical Rubber Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0967 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,781 $48,000 Not Implemented
UD0967 # 10 Y:2017 10 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,958 $0 Not Implemented
UD0967 # 11 Y:2017 11 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,362 $0 Not Implemented
UD0967 # 12 Y:2017 12 2017 INSULATE BARE EQUIPMENT $6,116 $2,824 Not Implemented
UD0967 # 13 Y:2017 13 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,271 $4,000 Not Implemented
UD0967 # 14 Y:2017 14 2017 MINIMIZE WATER USAGE $13,765 $6,000 Implemented
UD0967 # 15 Y:2017 15 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,735 $14,110 Not Implemented
UD0967 # 16 Y:2017 16 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $121,762 $503,900 Not Implemented
UD0967 # 17 Y:2017 17 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,764 $0 Implemented
UD0967 # 18 Y:2017 18 2017 DEVELOP A REPAIR/REPLACE POLICY $15,207 $65,253 Not Implemented
UD0967 # 19 Y:2017 19 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,773 $3,825 Not Implemented
UK1610 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,688 $4,985 Implemented
UK1610 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $374 $148 Implemented
UK1610 # 03 Y:2016 03 2016 DISCONNECT BALLASTS $92 $34 Not Implemented
UK1610 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $240 $470 Not Implemented
UK1610 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $525 $0 Implemented
UK1610 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $490 $0 Not Implemented
UK1610 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $196 $500 Implemented
UK1610 # 08 Y:2016 08 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,083 $500 Implemented
UK1610 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63 $0 Not Implemented
MI0292 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,353 $95,355 Implemented
MI0292 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,595 $1,660 Implemented
MI0292 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,974 $40 Not Implemented
MI0292 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,028 $8,642 Not Implemented
MI0292 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,106 $884 Implemented