IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
SIC 3061 Mechanical Rubber Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1069 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,796 $5,078 n/a
UD1069 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $1,799 $0 n/a
UD1069 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,372 $1,389 n/a
UD1069 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,894 $1,403 n/a
UD1069 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $31,978 $0 n/a
UD1069 # 07 Y:2023 07 2023 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $51,914 $75,982 n/a
UD1069 # 08 Y:2023 08 2023 COVER OPEN TANKS $42 $70 n/a
UD1069 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,461 $952 n/a
WV0615 # 06 Y:2021 06 2021 DEVELOP A REPAIR/REPLACE POLICY $2,598 $5,175 Implemented
WV0615 # 10 Y:2021 10 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $307 $1,000 Implemented
WV0615 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $944 $70 Implemented
WV0615 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,040 $233 Implemented
WV0615 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $4,561 $13,105 Not Implemented
WV0615 # 08 Y:2021 08 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $913 $688 Implemented
WV0615 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $755 $3,140 Not Implemented
WV0615 # 05 Y:2021 05 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,781 $2,300 Implemented
WV0615 # 01 Y:2021 01 2021 UPGRADE CONTROLS ON COMPRESSORS $8,661 $16,998 Not Implemented
WV0615 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $3,209 $13,902 Not Implemented
UD1013 # 02 Y:2020 02 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $75,593 $7,810 Not Implemented
UD1013 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,208 $0 Implemented
UD1013 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $768 $203 Not Implemented
UD1013 # 09 Y:2020 09 2020 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,053 $1,800 Not Implemented
UD1013 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,239 $14,500 Implemented
UD1013 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $9,464 $1,012 Not Implemented
UD1013 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,951 $5,000 Implemented