Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 3061 | Mechanical Rubber Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0313 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $4,207 | $340 | n/a |
TT0313 # 12 Y:2024 | 12 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $81,048 | $301,095 | n/a |
TT0313 # 11 Y:2024 | 11 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $92,752 | $120,000 | n/a |
TT0313 # 10 Y:2024 | 10 | 2024 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $261,275 | $200,000 | n/a |
TT0313 # 09 Y:2024 | 09 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,234 | $9,800 | n/a |
TT0313 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,284 | $1,200 | n/a |
TT0313 # 07 Y:2024 | 07 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,164 | $15,000 | n/a |
TT0313 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,134 | $3,000 | n/a |
TT0313 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $640 | $87 | n/a |
TT0313 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,724 | $2,600 | n/a |
TT0313 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,255 | $2,625 | n/a |
TT0313 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,143 | $60 | n/a |
CC0038 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $68,643 | $40,000 | n/a |
CC0038 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,471 | $1,560 | n/a |
CC0038 # 07 Y:2024 | 07 | 2024 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $10,304 | $24,675 | n/a |
CC0038 # 06 Y:2024 | 06 | 2024 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $8,129 | $6,200 | n/a |
CC0038 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $143,864 | $738,776 | n/a |
CC0038 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $34,175 | $0 | n/a |
CC0038 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,339 | $20,000 | n/a |
CC0038 # 02 Y:2024 | 02 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $48,942 | $14,000 | n/a |