IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

738

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1072 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,741 $5,000 Implemented
UD1072 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,199 $864 Implemented
UD1072 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $63 $216 Implemented
UD1072 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,892 $12,650 Implemented
SJ0010 # 08 Y:2024 08 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $274 $0 Implemented
SJ0010 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $9,629 $1,369 Implemented
SJ0010 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $58 $0 Implemented
SJ0010 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $0 Implemented
SJ0010 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $185 $786 Implemented
WV0653 # 13 Y:2023 13 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,757 $1,288 Implemented
WV0653 # 15 Y:2023 15 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,200 $3,036 Implemented
WV0653 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,961 $800 Implemented
WV0653 # 06 Y:2023 06 2023 MINIMIZE WATER USAGE $13,630 $45,516 Implemented
WV0653 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $33,555 $52,800 Implemented
WV0653 # 11 Y:2023 11 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,758 $2,675 Implemented
WV0653 # 14 Y:2023 14 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,320 $1,500 Implemented
WV0653 # 16 Y:2023 16 2023 INSULATE BARE EQUIPMENT $1,621 $787 Implemented
WV0653 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $10,683 $9,567 Implemented
WV0653 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $38,158 $64,250 Implemented
WV0653 # 10 Y:2023 10 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,884 $14,800 Implemented
UF0597 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $1,699 $4,994 Implemented
UF0597 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,736 $15,722 Implemented
UF0597 # 09 Y:2023 09 2023 IMPROVE SPACE COMFORT CONDITIONING $35,500 $4,261 Implemented
UF0597 # 05 Y:2023 05 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,959 $11,134 Implemented
UF0597 # 04 Y:2023 04 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,142 $22,000 Implemented